Weekendo
Easy-going

Lanaye (Visé) — Liège

23.8 km, Family level: almost flat, mostly smooth, some rougher sections surface.

Source: SPW, ‘RAVeL et Véloroutes en Wallonie’, CC BY 4.0 · checked on 18 November 2026. Before you go, check the official page: works and closures are announced there.

Official page of the stageGPX track (official site)

23.8 km

Length

Family

Level

Gradient

Almost flat

Surface

Mostly smooth, some rougher sections

Start

Train

Nearest station to the start: Eijsden, 3 km; at the finish: Liège-Saint-Lambert, 0.8 km.

Bike on the train (SNCB): €3 supplement off-peak (weekends included), €5 at peak times.

SNCB

Today and this weekend

Sunset today at the start: 16:45

Within 2 km of the route this weekend

Liège Ice Rink (Médiacité)Jiří Komárek · CC BY-SA 4.0opens Fri 20 November, 13:00

Liège Ice Rink (Médiacité)

Liège, Belgium 12 November – 31 March ≈ 1.0 km Today: 13:00–16:15, 20:15–22:15

Inside the Médiacité shopping centre, Liège's indoor rink offers 1,800 m² of ice and public sessions all season, with skate hire.

Snow & skating indoor

Map of the stage

Route W7 Sur la route des Ardennes

  1. Lanaye (Visé) — Liège23.8 km · Family · almost flat · Easy-going
  2. Liège — Durbuy64.3 km · Expert · flat with short climbs
  3. Durbuy — La-Roche-en-Ardenne32.7 km · Intermediate · flat with short climbs
  4. La-Roche-en-Ardenne — Libramont48.3 km · Intermediate · hilly
  5. Libramont — Bouillon37.3 km · Intermediate · hilly

Frequently asked questions

Are RAVeL stages suitable for e-bikes?

Yes: most follow old railway lines or towpaths, with very few climbs. The level and gradient of each stage are on its page.

Can I take my bike on the train?

In Belgium, yes (SNCB): €3 supplement off-peak — weekends are always off-peak — and €5 at peak times. Check the conditions on the SNCB website.

What does ‘Easy-going’ mean?

A ‘Family’ level stage, almost flat with a smooth or mostly smooth surface: ideal for a calm ride, at any age.

Are the paths open?

The network is run by the SPW. Works or temporary closures are announced on the official page of each stage: check before you go.