Thuin — Chimay
45.2 km, Family level: almost flat, smooth (asphalt, concrete) surface. Parking at the start.
Source: SPW, ‘RAVeL et Véloroutes en Wallonie’, CC BY 4.0 · checked on 18 November 2026. Before you go, check the official page: works and closures are announced there.
Level
Gradient
Almost flat
Surface
Smooth (asphalt, concrete)
Start
Start
Au début du RAVeL de la Ligne 109/2, au passage à niveau entre l’Avenue de la Couture et la rue du Fosteau à Thuin (à proximité du Centre de Découverte du Chemin de Fer Vicinal)
Parking at the start
Directions to the startTrain
Nearest station to the start: Thuin, 0.6 km; at the finish: Couvin, 12.6 km.
Bike on the train (SNCB): €3 supplement off-peak (weekends included), €5 at peak times.
SNCBToday and this weekend
Sunset today at the start: 16:53
Within 2 km of the route this weekend
Expo#32 : Christian Mary « Lignes – Matières – Lumières »
Exhibition in Thuin: dates, opening hours and address on the venue's page.
Map of the stage
Route W3 La Véloroute des Carnavals
Frequently asked questions
Are RAVeL stages suitable for e-bikes?
Yes: most follow old railway lines or towpaths, with very few climbs. The level and gradient of each stage are on its page.
Can I take my bike on the train?
In Belgium, yes (SNCB): €3 supplement off-peak — weekends are always off-peak — and €5 at peak times. Check the conditions on the SNCB website.
What does ‘Easy-going’ mean?
A ‘Family’ level stage, almost flat with a smooth or mostly smooth surface: ideal for a calm ride, at any age.
Are the paths open?
The network is run by the SPW. Works or temporary closures are announced on the official page of each stage: check before you go.
